Not really. He's walked round the house and kicked a few tyres.Has the heating engineer done anything?
I've suggested most of the stuff regarding new water main, new boiler location, moving from combi to cylinder.
I chose the EcoTec+ 637 and he confirmed that its up for the job and suggested the Super Oso 250L.
I completely trust his professional opinion ( assume he's told the builder he needs to replace the 22mm copper yesterday), I've just not seen much of him. My interface is with the builder.
When I see him I'll mention if he's planning two use two external pumps for the zones. He did mention that I could use a low-loss header but it might be overkill. He also suggested it would be expensive!