Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Aug 6, 2017
594
90
28
72
Norfolk
Member Type
DIY or Homeowner
How long has it been mandatory to install a fire valve in the fuel line when installing a new boiler to comply with Part J?
Now could someone hazard a guess as to roughly how long to do the following.
1 Remove an old oil fired boiler.
2 Replace with a new oil fired boiler
3 Install a 3m remote fire valve
4. Tidy up afterwards.

I am asking this as have received a quote for the above work. Now 2 yrs ago I received a quote from the same firm for the exact same job, minus the fire valve, when I was told would be completed in a day. Now it is going to take 3 days!
 
How long has it been mandatory to install a fire valve in the fuel line when installing a new boiler to comply with Part J?

I first did my OFTEC in 2007 and it was a requirement then and long before that too I imagine. The oldest boilers I worked on were more than 20 years old in 2007 and they always had a fire valve too, usually an old type with a low melting point metal holding them open designed to melt in fire and close the oil supply. (called a fusible head valve I think)

More modern designs are of the capillary type with remote probe.

It's an absolute must, not an optional extra and has been so for "ages".
 
Last edited:
I find odd then that my quote of 2 years ago never mentioned it, maybe was included in the quote and not specifically mentioned.
Am in the process of getting other quotes.
 
I suggest you get more people in for quotes as obviously you dont trust this person.

A couple of possibilities is

1) he may of been a bit inexperienced at quoting and didnt write everything down and cut his time down to win jobs.

2) hes realised you need to allow more time to do the jobs properly

3) maybe he thinks your a time waster as hes been out to price for you twice for the same job so just added an extra day on as twit tax.
 
  • Agree
Reactions: Riley
He works for a much bigger concern so does not really affect him if the get the job or not so points 1 and 2 possibly not valid. On point 3 they know why nothing has happened in 2 years and are okay with it
so do not thing they have loaded it intentionally.
 
Have not got around to asking what they intend to do with the condensate. Will need a soakaway as not on mains drainage.
 
He works for a much bigger concern so does not really affect him if the get the job or not so points 1 and 2 possibly not valid.

I'm not sure it wouldnt affect him as I dont think his boss will look at it and go ah well maybe next time.

I can just imagine the bosses at British gas saying to their sales men oh it doesn't matter if we get the installs or not and we wont sack you if you dont make so many sales.
 
As am installing twin insulated pipe between the house and the boiler house which necessitates digging a trench across a lawn. The guy with the digger can dig out a soakaway pit at the same time.
 
Using a digger for a condensate soakaway might be a bit overkill. Have a look online at the ready made plastic containers. They’re not very big.
 
If it’s like for like then two people could get it done in a long day we have done it before in a long day but normally 2 days should be there but depends on new location pipe runs condense etc.. 3 days maximum. Fire valves have always been there they have to be fitted and have to be on the oil line outside the building before it comes in! Just redone my often this week. Like others have said there is oil boilers out there that have been installed 20+ years ago. Be crazy not to fit one because if there is a fire then the outcome won’t be good.
 
If it’s like for like then two people could get it done in a long day we have done it before in a long day but normally 2 days should be there but depends on new location pipe runs condense etc.. 3 days maximum. Fire valves have always been there they have to be fitted and have to be on the oil line outside the building before it comes in! Just redone my often this week. Like others have said there is oil boilers out there that have been installed 20+ years ago. Be crazy not to fit one because if there is a fire then the outcome won’t be good.
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.