Hi All I have a client asking whether they can still use the AGA to heat rads once the air source heat pump is in. I think it is possible using a heat exchanger so the low pressure AGA and high pressure heat pump systems don't connect. I've seen it done on biomass systems but wonder what the implications are with heat pump legislation