Hi
My first post her but I was looking for some advice/to check that my thinking is correct about some work I want to do (I'm a willing novice). Ive got a wood pellet boiler and thermal store in the garage, feeding the central heating and hot water. Hot water storage and header tank in loft. A three way mixing valve needs to be replaced so I need to drain down the system and previous advice has suggested that I should also install some isolating valves to make it easier in the future. I think I'm fine with doing most of the work but have a couple of questionns/things to check. I've also mapped out the system in the garage in the hope that this helps (see below)
Flow - would I be right in thinking that A and B will both be expansion pipes, C as hot water out to house and D as cold in to system form header?
Location of isolating valves - any thoughts on locations?
Type of isolating valves to use - these are all 28mm pipes, copper in majority of system shown but plastic pipes to right hand side of pump on C and at D. I was looking at full-bore 28mm compression ball valves for the copper sections (is that correct and any ideas on where/what is best to get?), also can anyone recommend a product for the plastic sections if needed?
Drain down - there's a drain valve on the bottom of the thermal store. I'm fine with how to do this but wantedto check that all I need to do is to tie off the ballcock at the header tank?
Anyway, I hope this makes sense - any queries let me know. ANy help whatsoever would be very much appreciated.
Cheers
Ben
My first post her but I was looking for some advice/to check that my thinking is correct about some work I want to do (I'm a willing novice). Ive got a wood pellet boiler and thermal store in the garage, feeding the central heating and hot water. Hot water storage and header tank in loft. A three way mixing valve needs to be replaced so I need to drain down the system and previous advice has suggested that I should also install some isolating valves to make it easier in the future. I think I'm fine with doing most of the work but have a couple of questionns/things to check. I've also mapped out the system in the garage in the hope that this helps (see below)

Flow - would I be right in thinking that A and B will both be expansion pipes, C as hot water out to house and D as cold in to system form header?
Location of isolating valves - any thoughts on locations?
Type of isolating valves to use - these are all 28mm pipes, copper in majority of system shown but plastic pipes to right hand side of pump on C and at D. I was looking at full-bore 28mm compression ball valves for the copper sections (is that correct and any ideas on where/what is best to get?), also can anyone recommend a product for the plastic sections if needed?
Drain down - there's a drain valve on the bottom of the thermal store. I'm fine with how to do this but wantedto check that all I need to do is to tie off the ballcock at the header tank?
Anyway, I hope this makes sense - any queries let me know. ANy help whatsoever would be very much appreciated.
Cheers
Ben