The boiler is installed, it just needs commissioning, I suppose when there are no faults because if there are then it is the same as asking how long is a piece of string?

The boiler is an Ideal Logic Max c35Kw, if that makes any difference.

Cheers
 
give us a bit more ! , why didnt the installer commission it ?
Sure - I posed the question badly....
What I meant is how long does it take to undertake the Benchmark Commissioning Checklist? If that is a daft question, them my apologies.

I want to know because the boss called me at 16:15 and said that the boiler would be up and running later that same day, but looking at thephotos, it seems that there was still quite a lot of work to do, including the commissioning. Safe to say, that the job ran over.

Actually, I can upload some photos, the first is what it looked like at 17:51 on the day of the install (some way off a finished job) and the remaining ones are what it looked like post commissioning on-hand over to the customer, bar the last one is what it looked like once they had returned and sealed the internal seal.- - following an AT RISK notice issued by the manufacturer.

And yes, the original flue terminal exit, was left open and exposed to the elements (it was the 24-25th January).
 

Attachments

  • 007 Flue Installation In-Progress.jpg
    007 Flue Installation In-Progress.jpg
    157.8 KB · Views: 45
  • 1-Hometeam Installation of Flue taken 2019 06 15 (7).jpg
    1-Hometeam Installation of Flue taken 2019 06 15 (7).jpg
    178.9 KB · Views: 41
  • 1-IMG_20220427_170034.jpg
    1-IMG_20220427_170034.jpg
    218.3 KB · Views: 40
  • Hometeam Installation of Flue taken 2019 06 15 (2).jpg
    Hometeam Installation of Flue taken 2019 06 15 (2).jpg
    185.2 KB · Views: 37
  • IMG_20220427_170011.jpg
    IMG_20220427_170011.jpg
    266.8 KB · Views: 42
  • 1-IMG_20220427_170533.jpg
    1-IMG_20220427_170533.jpg
    217.2 KB · Views: 44
I normally allow for an afternoon for completing / filling in the paperwork , commissioning and filling / making good
 
They should make good the old flue hole, at least temporarily block it up until they can.

Didn't you say this was a listed building? I must say all that flue hanging in a residential won't and doesn't look great.
 

Official Sponsors of Plumbers Talk

Reply to the thread, titled "How long does it take to Commission a new boiler" which is posted in Boiler Advice Forum on Plumbers Forums.

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Thread starter

Joined
Location
Office
Member Type
DIY or Homeowner

Thread Information

Title
How long does it take to Commission a new boiler
Prefix
N/A
Forum
Boiler Advice Forum
Start date
Last reply date
Replies
5

Thread Tags

Thread statistics

Created
SweetWilliam,
Last reply from
SweetWilliam,
Replies
5
Views
2,296

Weekly or Monthly Email Digest

Back
Top