And filled it to the top and let it out to do a full flood test on the waste. No leaks, dry as a bone, all fine. Then I realised I hadn't solvent welded one fitting onto it's pipe. Yet no leaks. Mind you I've also seen some compression joints on mains pressure that weren't even hand-tight and didn't leak.
Like, what gives?
On a secondary point. I'm a member of a gym but since I've gone full time I literally have no energy left in the evening. Will this pass? I remember seeing quite a few plumbing vans outside the gym. Even back then I thought, 'How do they have the energy?' Could you manage it? (irrespective of whether or not you wanted to...)
Like, what gives?
On a secondary point. I'm a member of a gym but since I've gone full time I literally have no energy left in the evening. Will this pass? I remember seeing quite a few plumbing vans outside the gym. Even back then I thought, 'How do they have the energy?' Could you manage it? (irrespective of whether or not you wanted to...)