Hi,
Sorry fo the length of a first post, but here goes!
I've pulled up some floorboards to move a radiator whilst decorating an old Scottish farmhouse. This has, inevitably, led on to more work on the heating system until I've got to a reasonably deep level of work.
I'm running a Worcester 12/14 and an old 12 or 14 KW Arrow solid fuel stove via a neutraliser. The radiator circuit pipework from the neutraliser, to the pump and to a point it disappears into a concrete floor is 22mm The return is the same. I have pulled up floorboards in the next room, inline with the concrete entry point, only to find it is 15mm from there to the 3 attaching rads! There are 15mm branches off the 22mm manifold for a further 4 rads.
I am looking to shuffle radiators, and reroute some of the pipes, allowing for the fact I will be doing more work at a later date.
I would prefer the manifold flow and return to be 22mm, with each rad branch being 15mm. Can I keep the buried 15mm pipe as is, and step back up to 22mm for the 5 radiators I want on now. I will be looking to replace the buried 15mm with 22 when I renovate that room?
This will mean my circuit goes from 22mm down to 15mm, feeding rad, back up to 22mm feeding a further 5 rads
I understand it is not an ideal solution, but my choice is to step up, or run the rest of the manifold on 15mm, which will hold 5 or 6 rads eventually.
Chasing out the concrete floor and relaying in 22mm is not an option at the moment, although as mentioned above, I will be able to chase in the bigger size in a year or so.
Sorry fo the length of a first post, but here goes!
I've pulled up some floorboards to move a radiator whilst decorating an old Scottish farmhouse. This has, inevitably, led on to more work on the heating system until I've got to a reasonably deep level of work.
I'm running a Worcester 12/14 and an old 12 or 14 KW Arrow solid fuel stove via a neutraliser. The radiator circuit pipework from the neutraliser, to the pump and to a point it disappears into a concrete floor is 22mm The return is the same. I have pulled up floorboards in the next room, inline with the concrete entry point, only to find it is 15mm from there to the 3 attaching rads! There are 15mm branches off the 22mm manifold for a further 4 rads.
I am looking to shuffle radiators, and reroute some of the pipes, allowing for the fact I will be doing more work at a later date.
I would prefer the manifold flow and return to be 22mm, with each rad branch being 15mm. Can I keep the buried 15mm pipe as is, and step back up to 22mm for the 5 radiators I want on now. I will be looking to replace the buried 15mm with 22 when I renovate that room?
This will mean my circuit goes from 22mm down to 15mm, feeding rad, back up to 22mm feeding a further 5 rads
I understand it is not an ideal solution, but my choice is to step up, or run the rest of the manifold on 15mm, which will hold 5 or 6 rads eventually.
Chasing out the concrete floor and relaying in 22mm is not an option at the moment, although as mentioned above, I will be able to chase in the bigger size in a year or so.