K
Kat
Hi in a 4 year old house that had rubbish plumbing. Going to be re-plumbed, pipework only, (not boiler or rads) mix of copper and plastic some external as we had oak floors laid and vinyls. Plumber quoted we accepted but now a bit confused. Should he have quoted for a powerflush? Does new pipework need to be powerflushed? And will system need to be topped up afterwards with inhibitor?
Thanks
Thanks