Second Fix Price Work
I've been given the opportunity of second fix price work from an old employer
3 and 4 bed houses with heat pump cylinder, rads, main bathroom, ensuite, manifold and kitchen sink,
Question is how long would that physically take some to do never done price before was think of giving it 2 weeks to test it out, but with towel rails, shower doors bath screens and heat recovery grills I think these would be time consuming.
Ideally would be looking at getting 1 1/2 done a week
I've been given the opportunity of second fix price work from an old employer
3 and 4 bed houses with heat pump cylinder, rads, main bathroom, ensuite, manifold and kitchen sink,
Question is how long would that physically take some to do never done price before was think of giving it 2 weeks to test it out, but with towel rails, shower doors bath screens and heat recovery grills I think these would be time consuming.
Ideally would be looking at getting 1 1/2 done a week