T
tiling spread
any one on site at the mo went too look at a plastering job last week and there was
palm scanners and turnstiles at the gate its bonkers
theres still 99% of eu workers still on site theres more bent cscs cards on site now why do we bother with them.
it was for 200m2 float and set and 700m2 glue and set
12 lids and 70m2 webber rend to go up with upvc beads
float&set £3.70p m2
glue&set £1.90p m2
render £3.oop m2
upvc £00.60p m
there was 2 gangs of eu workers plastering (sponge floating set 180m2 per day 😡
palm scanners and turnstiles at the gate its bonkers
theres still 99% of eu workers still on site theres more bent cscs cards on site now why do we bother with them.
it was for 200m2 float and set and 700m2 glue and set
12 lids and 70m2 webber rend to go up with upvc beads
float&set £3.70p m2
glue&set £1.90p m2
render £3.oop m2
upvc £00.60p m
there was 2 gangs of eu workers plastering (sponge floating set 180m2 per day 😡