Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Sep 10, 2017
133
33
28
34
East sussex
Member Type
General Plumber
Hi guys can someone explain to me how the wiring of UFH with the use of actuators is wired into an S plan please? its a 3 zone valve set up, Rads upstairs, HW, UFH downstairs. I'm okay with s plan wiring on a simple 2 channel etc but first time doing UFH with actuators and separate room stats. I cant find a simple explanation as to how it all ties together. I think we are going to run the UFH and Rads on the 2 channel and HW on a timer. We have a polypipe wiring centre for the UFH actuators and polypipe UFH manifold. i just want to understand what does the switching and so on. TIA
 
  • Like
Reactions: Scott_D
Wire the zone heads (ufh) to the ufh control also the pump and 2 port then you should have a feed out eg switch on

eg like below (as a rough guide)
 

Attachments

  • S Plan Plus Wiring Ideal Logic WIth UFH.png
    S Plan Plus Wiring Ideal Logic WIth UFH.png
    145 KB · Views: 81
  • Useful
Reactions: Chester
Wire the zone heads (ufh) to the ufh control also the pump and 2 port then you should have a feed out eg switch on

eg like below (as a rough guide)
cheers Shaun, so the micro switch of the 2 port for the UFH is used to start the manifold pump in this instance and also on the system I'm working on instead of just one zone like in your pic linking the actuators to the nest I'll have multiple room stats connecting to each individual actuator. damn confusing, next time I do this ill definitely be ordering the controls lol.
 
If you want send me a list of your kit and I will knock up a wiring diagram like the above
legend, yes please shaun, polypipe UFH87W centre with UFHPROGW x 4, honeywell 2 ports, worcester bosch greenstar heat only 24kw, grund pump for Rads, and grundfos on manifold for UFH, I'm not sure what programmer he's thinking but maybe just use a basic drayton 2 channel for scematic and a honeywell on off wall stat. oh and timer for HW, hasn't got it but basic one i assume.
 
legend, yes please shaun, polypipe UFH87W centre with UFHPROGW x 4, honeywell 2 ports, worcester bosch greenstar heat only 24kw, grund pump for Rads, and grundfos on manifold for UFH, I'm not sure what programmer he's thinking but maybe just use a basic drayton 2 channel for scematic and a honeywell on off wall stat. oh and timer for HW, hasn't got it but basic one i assume.

That’s fine will just wire it up for Drayton lifestyles a 2 channel and a single channel if you choose to go for another one the wiring will be the same

Give me a couple of days and will shoot something over to you 👍
 
Hi Shaun, have you still got this wiring diagram i am having exactly the same issue.... i cannot see the attachments for some reason.. and the same kit is installed except there is a 3rd 2 port valve.. appreciate any help possible thanks very much
 
Hi Shaun, have you still got this wiring diagram i am having exactly the same issue.... i cannot see the attachments for some reason.. and the same kit is installed except there is a 3rd 2 port valve.. appreciate any help possible thanks very much

s-plan-plus-wiring-with-ufh-and-ri-png.63239



I’m guessing you have rads aswell ?
 
  • Like
Reactions: Chester

Official Sponsors of Plumbers Talk

Similar plumbing topics

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.