Hi all
went to look at a job today and the customer would like an unvented cylinder got a 25mm main coming in but due to the way the house is trying to get a balanced cold feed away from the cylinder will mean loads of floor up and a general pain.
Is it ok to put a prv in the cold just after the stopcock then run 22mm up to the cylinder???
i think I remember somthing about the 22 to the cylinder having to be uninterrupted.
went to look at a job today and the customer would like an unvented cylinder got a 25mm main coming in but due to the way the house is trying to get a balanced cold feed away from the cylinder will mean loads of floor up and a general pain.
Is it ok to put a prv in the cold just after the stopcock then run 22mm up to the cylinder???
i think I remember somthing about the 22 to the cylinder having to be uninterrupted.