Hi All,
I have plumbed my bathroom myself. I initially wanted to install a shower and bought a 2 outlet triton digital shower, midway in and I changed mind for a bath shower while the plumbing for the shower was already done. The digital valve was installed in the loft, 1 outlet to ceiling shower head and the other to handheld shower head. To add a bath filler, I split the handheld shower outlet into 2 outlets by installing a 2 way diverter valve on the bath rim, which made the pipe run more complicated and longer. Now when I divert water to the bath filler and shut the digital shower off, I hear a loud bang in the pipe work as if two pipes are hitting each other very aggressively. The ceiling shower head and the handheld shower shake as well when the digital valve is turned off on them but not as loud as the bath overflow filler. I can only see the inlet pipes to the digital valve shaking when the hammering happens. I have mains supply water which its pressure seems high and a combined boiler, the loft pipework is not clipped properly. The run from the divertor valve to the bath filler is in plastic pipe and the rest are in cp. Any ideas?
I have plumbed my bathroom myself. I initially wanted to install a shower and bought a 2 outlet triton digital shower, midway in and I changed mind for a bath shower while the plumbing for the shower was already done. The digital valve was installed in the loft, 1 outlet to ceiling shower head and the other to handheld shower head. To add a bath filler, I split the handheld shower outlet into 2 outlets by installing a 2 way diverter valve on the bath rim, which made the pipe run more complicated and longer. Now when I divert water to the bath filler and shut the digital shower off, I hear a loud bang in the pipe work as if two pipes are hitting each other very aggressively. The ceiling shower head and the handheld shower shake as well when the digital valve is turned off on them but not as loud as the bath overflow filler. I can only see the inlet pipes to the digital valve shaking when the hammering happens. I have mains supply water which its pressure seems high and a combined boiler, the loft pipework is not clipped properly. The run from the divertor valve to the bath filler is in plastic pipe and the rest are in cp. Any ideas?