I've got to visit my mum at the weekend, as the back entry gully outside her kitchen door is backing up through the metal grate. The kitchen sink drains into it. I had a quick look last weekend, and the gully itself is clear, and running water from a hose into it causes it to back up after a while, not immediately - so blockage is under the drive.
Her semi has the b/e gully on the side of house as well as a soil stack a few feet away. I assume that I will need to rod up hill towards the house from the inspection chamber that is half way down the drive. My question is, when I lift the manhole on chamber, will I find;
A) One outlet because the b/entry gully and pipe from soil stack join into one pipe between house and inspection chamber
or
B) Two outlets into insp. chamber, one from kitchen b/e gully, one from soil stack (ie. 2x seperate pipes running from house to insp. chamber)
Hope this makes sense, and thanks for any advice.
Her semi has the b/e gully on the side of house as well as a soil stack a few feet away. I assume that I will need to rod up hill towards the house from the inspection chamber that is half way down the drive. My question is, when I lift the manhole on chamber, will I find;
A) One outlet because the b/entry gully and pipe from soil stack join into one pipe between house and inspection chamber
or
B) Two outlets into insp. chamber, one from kitchen b/e gully, one from soil stack (ie. 2x seperate pipes running from house to insp. chamber)
Hope this makes sense, and thanks for any advice.
Last edited: