Dec 28, 2010
184
8
18
I have been asked to quote a 15 bed care home full plumbing install in a new build. I am typically used to domestic installs (some large ones). Underfloor heating throughout so that is simple but I have no experience with this volume of hot water. I have linked 2 300L unvented cylinders on a large domestic property before but I would like to see some guidance for best practice installs of this nature, I assume hotel installs would be similar.

Would they generally be mains fed or tank fed and pumped to cope with the large demand? I would assume there could be 6/7 showers or baths running simultaneously.

the building is a single storey.

Thank you for any input.
 
Break tank and a booster set
2 boilers linked together
A large or two unvented cylinders

The ones we do are all wet room ensuites with one LST rad per bedroom and an ensuite rad if it's on 2 external walls
 
Get it properly designed. You can open yourself yo being sued. You will need to check your liability and professional indemnity too. The system needs to be designed to circulate high enough temp to prevent leg one'll and then be mixed at appliance yo prevent scalding.
 
  • Like
Reactions: 1 person
Surely it's not much different to a good domestic install. From what I can gather it's:
Boilers
Break tank and booster
Unvented Cylinders
Thermostatic mixing valves
Backflow prevention
Well insulated pipework
Legionella prevention in place

I have emailed a few local commercial plumbers and awaiting a response but it would be nice if I could do some research on best practice or typical system layouts. I've done ground source heat pumps in the past, if you read, understand and follow the instructions then you can't go wrong.
 
Surely it's not much different to a good domestic install. From what I can gather it's:
Boilers
Break tank and booster
Unvented Cylinders
Thermostatic mixing valves
Backflow prevention
Well insulated pipework
Legionella prevention in place

I have emailed a few local commercial plumbers and awaiting a response but it would be nice if I could do some research on best practice or typical system layouts. I've done ground source heat pumps in the past, if you read, understand and follow the instructions then you can't go wrong.

It's very different sorry to say you haven't said anything about secondary returns and you will need to be commercially reg for the boilers
 
a secondary return is a normal thing on domestic installs which I've done on numerous occasions. That doesn't really make me think I shouldn't be doing the install. I was initially thinking 2 boilers one for the heating and one for the hot water to keep me out of the commercial side. Am I barking up the wrong tree. . .
 
a secondary return is a normal thing on domestic installs which I've done on numerous occasions. That doesn't really make me think I shouldn't be doing the install. I was initially thinking 2 boilers one for the heating and one for the hot water to keep me out of the commercial side. Am I barking up the wrong tree. . .

I would think there would be more than a 70 kw load total
 
a secondary return is a normal thing on domestic installs which I've done on numerous occasions. That doesn't really make me think I shouldn't be doing the install. I was initially thinking 2 boilers one for the heating and one for the hot water to keep me out of the commercial side. Am I barking up the wrong tree. . .

I would think there would be more than a 70 kw load total

Two options for hot water

Andrews water heater (commercial appliance)
2x 300l unvented water heaters around 50-60 kw for both which would take you close to the limit on there own
 
Not yet, I was looking for some guidance documentation on the design, I'm also awaiting response from some local commercial guys to see if they will come on board with me. Obviously if the system is over 70kw then I would need to get someone involved regardless.
 
Megaflo 300l recovery time is around 50 minutes from cold with a 20kw boiler
 
What recovery time do you aim for and what volume is usually allowed per resident
 
I have done these before contact rinnai they will just do it for you ,
Thats what i use to do
 