B
Bunker
Gents, please help with this odd one...
Old prog and my fitted new one:
HW brings boiler on.
CH does not.
If HW on and CH advanced, 3pv will move over to middle, all good.
If HW then off at prog, boiler stays on until CH off (cant remember if 3pv goes to CH or stays in Middle)
Dual channel prog but no tank stat. Call linked to common on wiring centre, normal links 13/14 an 8/ 16 so whilst not ideal, lack of tank stat should be ok, always used to work.
New 3pv wired in but when CH called for, indicator get stuck in the middle and just keeps clicking.
I tried bypassing room stat with links call/ com in case it was stat.
All wiring looks ok, clearly labelled.
Ive checked all the links, I did find that 3 was linked to 9 instead of 4 to 9 but that didnt help when rectified.
Im a boiler engineer and this sort of thing I enjoy and am reasonably good at but its not my main thing, anyone understand what Ive written?
Thanks
Old prog and my fitted new one:
HW brings boiler on.
CH does not.
If HW on and CH advanced, 3pv will move over to middle, all good.
If HW then off at prog, boiler stays on until CH off (cant remember if 3pv goes to CH or stays in Middle)
Dual channel prog but no tank stat. Call linked to common on wiring centre, normal links 13/14 an 8/ 16 so whilst not ideal, lack of tank stat should be ok, always used to work.
New 3pv wired in but when CH called for, indicator get stuck in the middle and just keeps clicking.
I tried bypassing room stat with links call/ com in case it was stat.
All wiring looks ok, clearly labelled.
Ive checked all the links, I did find that 3 was linked to 9 instead of 4 to 9 but that didnt help when rectified.
Im a boiler engineer and this sort of thing I enjoy and am reasonably good at but its not my main thing, anyone understand what Ive written?
Thanks