Hi Guys, thanks for your feedback.
I just want to clarify how how I would manage the flow and return for the CH, bearing in mind that the pipe work will be coming down from the loft.
I have attached a little picture to which I think is the correct way including HW draw off. The cold feed and supply is self explanatory.
Your thoughts would be appreciated, cheers again!
😀
well we are taking out the tank and cylinder
mains to the tank is diverted to mains supply to boiler
hot is connected to old vent and old tee to cylinder removed..though you may wish to run as much as posssible in 15mm to cut down on water content in pipework,to get quicker response at taps and less waste of hot water left in pipework
flow and return run down to cylinder cupboard,using old 22mm vent if you want for one run
link heating flow to old heating flow after removing old pump and motorised valve
link return to old cylinder return
remove boiler and cap of pipe work,make good wall
gas run to be made in 22mm,if meter outside run up outside wall,will have to be able to isolate gas supply from outside loft space so maybe drop/loop down with isolation valve to allow gas to be isolated
condensate pipe work will require running to hopefully plastic guttering or plastic soil,if problem maybe run down to old airing cupboard and into bathroom waste if next to cupboard
Power to boiler extended from airing cupboard to roof,with isolation in roof also,leaving isolation down stairs as well good idea
wireless room thermostat
ladder fixed access to roof
boarded out from opening to boiler ,with work area
as said rails around opening
cage around boiler or railed off area for protection,the loft is a storage area and if boiler not protected boxes,surf boards and rubber studded outfits ect can fall against,infringing on required clearances and ventilation requirements
fixed light for area
advise smoke detector
advise a pressure gauge fitted on system maybe in airing cupboard for easy checking,maybe filling loop as well fitted if mains running through old airing cupboard or maybe use old heating cold feed pipe work to bring mains down,just thoughts
all pipe work well lagged in roof space
if old wc supplied by tank,replace ball vale washers and possible inner jet
probably missed something that will be picked up to add to your check list
🙂