I’ve fitted 2 new Mira showers, fixed a leak on a basin, repaired a faulty pop up waste, tightened a moving kitchen monobloc tap and fixed a dishwasher. That’s my money earnt for the dayExcuse TFJ, I’ve first fix a kitchen, remove 4 x rads and lagged( mitred joints) about 150m of combined 28/22/15mm pipework up at high level and underfloor boards.
But still had time to check in.
You heard of 4G?
😀