K
Koogatubac
Fastest combi to combi ive done (when i was a apprentice) was 45mins. Explanation:
Baxi 105 to Baxi Duo Tec (1st Model)
- drain down legs of boiler
- whip old boiler off BUT not jig.
- chisel flue hole because the duo tecs where higher i think
- put new boiler on old jig with new washers.
- fill up, check for leaks and gas rate then leave
Btw NEVER GOT FLUSHED
This was back in 2006 so no flue gas analyser
Baxi 105 to Baxi Duo Tec (1st Model)
- drain down legs of boiler
- whip old boiler off BUT not jig.
- chisel flue hole because the duo tecs where higher i think
- put new boiler on old jig with new washers.
- fill up, check for leaks and gas rate then leave
Btw NEVER GOT FLUSHED
This was back in 2006 so no flue gas analyser