Getting fed up of pricing boiler swaps and heating systems bathrooms etc and not getting them all I have got is 1 that I screwed up and under priced so I didn't make a lot for 10 days work. Am I overcharging/ being unrealistic?
1) combi swap, duotec he 28, horizontal flue, magnaclean, rf stat (salus) gas is fine boiler in same position condense to waste about 2 Mtrs away. £1713.51
2) combi swap, duotec he 33, horizontal flue, rf stat, 8mtrs of 28mm easy run for gas, condense 1.5 Mtrs. £1771.48
3) full install, duotec he 28, horizontal flue, 5 rads, rf stat, 39Mtrs 15mm, 12mtrs 22mm, condense directly below, sparky to come and earth gas pipe and fit new switch for boiler, lagging in loft, £3343.94
What do you reckon are those prices sensible?
Forgot.
4) bathroom suite, customer supplying sanitary and taps I supply every thing else including a concealed system, floor to come up (wood) to alter soil for toilet, 1st fix and 2nd fix 2-2.5 days work £800.00
1) combi swap, duotec he 28, horizontal flue, magnaclean, rf stat (salus) gas is fine boiler in same position condense to waste about 2 Mtrs away. £1713.51
2) combi swap, duotec he 33, horizontal flue, rf stat, 8mtrs of 28mm easy run for gas, condense 1.5 Mtrs. £1771.48
3) full install, duotec he 28, horizontal flue, 5 rads, rf stat, 39Mtrs 15mm, 12mtrs 22mm, condense directly below, sparky to come and earth gas pipe and fit new switch for boiler, lagging in loft, £3343.94
What do you reckon are those prices sensible?
Forgot.
4) bathroom suite, customer supplying sanitary and taps I supply every thing else including a concealed system, floor to come up (wood) to alter soil for toilet, 1st fix and 2nd fix 2-2.5 days work £800.00
Last edited: