Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Well the plumber says the I combi will run 2 bathrooms with mixer tap. The wet room will have mixer taps but moh wants an electric upstairs just in case the boiler breaks down although our last boiler did not in 22yrs.
 
Well the plumber says the I combi will run 2 bathrooms with mixer tap. The wet room will have mixer taps but moh wants an electric upstairs just in case the boiler breaks down although our last boiler did not in 22yrs.

tbh i would be suprised if your boiler will last any more than 12-15 years max and the plumber is wrong, ask him for his heat loss calcs for rads also
 
So are they telling you you have to have an electric shower or is this what you want? It seems rather that they are dictating what youre having in your house when it should be the other way around
 
I think to summarise OP you need to sit down and have a discussion with your architect/builder/plumber. What they have installed sounds to me like an inferior system to what I think 99% of the professional people on this website would recommend. If they are telling you to install an electric shower just to cover up their **** up then I'm sorry you need to bin them
 
We don't know what budget was being worked to so shouldn't blame the plumber just yet.

What people want and what they are prepared to pay for are often very different
 
It's very true mate I guess it's just common sense to us if extensive building works are being done that you would put in a decent future proof heating and hot water system
 
Ok guys lots of replys and thanks

The whole job is 85k incl kitchen ext , sunroom 10 x 10 wet room created from rear of garage, kitchen completely gutted and Reftted with howdens Tewkesbury range and fully tiled bathroom completely gutted refiited Inc fully tiled walls laminate flooring to all new areas Inc underfloor heating.All existing rads replaced plus new ones to new areas also boiler to run 2 showers and the possibility of running washing machine. All new 22mm pipework from mains to boiler etc and new Windows to match at rear of property
 
Last edited by a moderator:
Well they've not supplied what you asked for in terms of the boiler. I'd make a stand and get them to rethink their install
 
If we are talking of a tank in the attic then we got rid 22yrs ago or are there other options
 
Look up unvented cylinder and system/heat only boiler. Unvented cylinder will allow mains pressure balanced hot & cold water at every outlet. Best solution for you all round if your mains flow and pressure are up to it. No loft tanks unless that's where you decide to site the cylinder
 
If we are talking of a tank in the attic then we got rid 22yrs ago or are there other options

cylinder

megaflo-unvented-hot-water-cylinder.jpg
 
80K build, underfloor heating and you are fitting a Laminate Floor? Take a looks at LVT, it's the way forward!
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

J
Replies
2
Views
618
J

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.