just wanted to share some pics of my first cylinder/boiler install.. I’m quite proud of myself. Place had electric heaters before. So brand new system, 3 level flat, 2 bathrooms, new gas run & meter, 21kw Baxi EcoBlue heat only, 250ltr unvented cylinder, 10 rad, s-plan system. Excuse the stray wires around the electronics, I’m going back tomorrow to tidy them up with some mini trunking.

D62F9C57-5677-406C-9B56-5FA74598928C.jpeg


EB921D94-36E0-4A08-831A-055D85985B2F.jpeg


6AFA4439-EB7F-4C70-9151-364C70EED9BA.jpeg
 
the pressure gauge its upside down 😀
Haha I know, annoying right!!! I’ll sort the discharge tomorrow.. gotta Flick the system anyway and tidy the cables.. I thought it was just a max of 600mm from the t&p Relief.. thanks for pointing that out shaun 🙂
 
  • Like
Reactions: ShaunCorbs
Very tidy mate. How long did that all take? Just one question, is there much space above the vessels?
 
Very tidy mate. How long did that all take? Just one question, is there much space above the vessels?
Enough space to be able to remove them if they need replacing or stick a pump in if need recharging.. ah mate, time is my nemesis, all in it probably took me about 10/11 days. I’m not the quickest guy in the world!!
 