O
on31ll
Thanks guys. These boilers expensive ? Seems the prices for the jobs are outragous
Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws
Back end valve is set up wrong. The back end valve on them is a three port and designed to maintain a minimum return temperature of 60-65°
Set up wrong in what way ? How is it rectified ?
That thread was confusing. Hahah
Stupid question i understand the reason for buffers etc but this system is in a big block of a school. Big heating system etc. so couldnt the boiler be linked directly to the heating and have a lower set temp before the boiler kicks in again ?
Ive been the that building again today. At the plate heat ex the flow is hot and the return is stone cold. To me seems like its undersized.
That biomass is just linked to the the buffers then from that pipework to a heat ex.
So whats the point in the buffers on that system ? Its like 3 curcuits to do one job.
Reply to the thread, titled "Bio mass boilers" which is posted in Boiler Advice Forum on Plumbers Forums.
We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.