R
REDSAW
bit of advice pleaze,
just landed an insurance job in an upstairs bathroom 1950's semi.
the toilet also requires moving allong the same wall (exchange position with basin nearer to stack).
the pan connector goes verticle down into and under the floor boards parrallel with the joist's and connects to an internall stack in the corner of the room (same wall) around 1.5m. the waste pipe is potted to the pan and is all cast iron.
what i need to do is cut the soil pipe put in 2 elbows and bring back up into the pan.
queries...
should i cut the iron with my big wheel or something better like a recip?.
will the stack joint be easily disturbed whilst cutting (all boxed in) or solid?.
which are the best type elbows to use as the iron seems clean but quite pitted in the cast (sand pitting),?.
is there any point putting a rodding eye in the first bend from stack since it will be under the floor boards?.
shall the soil pipe need or be better supported to the joist using builders band or simmular?.
not quite the same as external stack, as the kitchen is directly below and i like to be thorough as i wouldnt like turds in my cornflakes either.😀
thanx for the input and opinions guys.
just landed an insurance job in an upstairs bathroom 1950's semi.
the toilet also requires moving allong the same wall (exchange position with basin nearer to stack).
the pan connector goes verticle down into and under the floor boards parrallel with the joist's and connects to an internall stack in the corner of the room (same wall) around 1.5m. the waste pipe is potted to the pan and is all cast iron.
what i need to do is cut the soil pipe put in 2 elbows and bring back up into the pan.
queries...
should i cut the iron with my big wheel or something better like a recip?.
will the stack joint be easily disturbed whilst cutting (all boxed in) or solid?.
which are the best type elbows to use as the iron seems clean but quite pitted in the cast (sand pitting),?.
is there any point putting a rodding eye in the first bend from stack since it will be under the floor boards?.
shall the soil pipe need or be better supported to the joist using builders band or simmular?.
not quite the same as external stack, as the kitchen is directly below and i like to be thorough as i wouldnt like turds in my cornflakes either.😀
thanx for the input and opinions guys.