ShaunCorbs Super Moderator Staff member S. Mod Plumber Gas Engineer Subscribed Oct 19, 2021 #26 You run one only or delay the install
M Mjward Oct 19, 2021 #27 ShaunCorbs said: You run one only or delay the install Click to expand... I feel an idiot, of course that the solution! Will get them to fit new and commission but will leave off until gas sorted. Thanks Shaun 👍
ShaunCorbs said: You run one only or delay the install Click to expand... I feel an idiot, of course that the solution! Will get them to fit new and commission but will leave off until gas sorted. Thanks Shaun 👍
ShaunCorbs Super Moderator Staff member S. Mod Plumber Gas Engineer Subscribed Oct 19, 2021 #28 I would get them to come back your installers and just double check all the pressures etc once it’s been done and on
I would get them to come back your installers and just double check all the pressures etc once it’s been done and on
king of pipes Esteemed Plumber Gas Engineer Subscribed Oct 19, 2021 #30 Get it all fitted but only run one boiler at a time untill the u16 is fitted , low gas pressure will cause the boilers to fail.
Get it all fitted but only run one boiler at a time untill the u16 is fitted , low gas pressure will cause the boilers to fail.