Been asked to fully plumb a new build 3 bed house in the midlands, which I've done before but feel I went too cheap on the last one so want a few opinions on price.
To plumb full heating system, no microbore.
10 rads
Duotec 28 combi std horizontal flue
Gas hob
10m gas line easy run
Easy condensate
1 bathroom bath and shower tray
1 en-suite
1 cloaks room
All ground up s+v pipe (2 stacks)
Customer to supply all sanitaryware
Last full house I did was a 2 bed 1 bathroom 1 wc room 7 rads no microbore customer supplied sanitaryware I priced at £4400 but at the end of the job I felt I'd sold myself short.
What do you guys think?
To plumb full heating system, no microbore.
10 rads
Duotec 28 combi std horizontal flue
Gas hob
10m gas line easy run
Easy condensate
1 bathroom bath and shower tray
1 en-suite
1 cloaks room
All ground up s+v pipe (2 stacks)
Customer to supply all sanitaryware
Last full house I did was a 2 bed 1 bathroom 1 wc room 7 rads no microbore customer supplied sanitaryware I priced at £4400 but at the end of the job I felt I'd sold myself short.
What do you guys think?