Hi, i have unfortunately been let down and need to get some work completed before saturday that will comply with building regs. Being a novice i hope someone can help.
I Need to do first fix for 2 bathrooms on ground floor using block and beam. The soil pipes come in to the middle of the walls from the outside and not in the corners where the toilets will be. Its block and beam floor, whivh will have 100mm celotex then screeded on saturday.
1. Should i cut the soil pipes near the wall and put a 90 110 elbow to move it along the wall then another 90 110 elbow to bring it verticle through a block into the room for each toilet
2. What is the best way to run the waste pipes? Each room has sink and bath / shower which needs to connect to this soil stack. And one room will have a dishwasher coming through an internal wall to join one of the sinks.
Should the wastes go straight under the floor and join the soil pipe using y bends and a boss adapter? Or should they go on top of the block and beam under the celotex and join the soil pipe in the room itself?
3. Whats the best way to join the 40mm waste pipes to the soil stack? And i assume the sink will be a 32mn pipe, do i just want an adapter to make it 40mm somewhere ?
Any help really appreciated.
Thanks
I Need to do first fix for 2 bathrooms on ground floor using block and beam. The soil pipes come in to the middle of the walls from the outside and not in the corners where the toilets will be. Its block and beam floor, whivh will have 100mm celotex then screeded on saturday.
1. Should i cut the soil pipes near the wall and put a 90 110 elbow to move it along the wall then another 90 110 elbow to bring it verticle through a block into the room for each toilet
2. What is the best way to run the waste pipes? Each room has sink and bath / shower which needs to connect to this soil stack. And one room will have a dishwasher coming through an internal wall to join one of the sinks.
Should the wastes go straight under the floor and join the soil pipe using y bends and a boss adapter? Or should they go on top of the block and beam under the celotex and join the soil pipe in the room itself?
3. Whats the best way to join the 40mm waste pipes to the soil stack? And i assume the sink will be a 32mn pipe, do i just want an adapter to make it 40mm somewhere ?
Any help really appreciated.
Thanks