i have got one of those customers that are being a pain as some are
i done a job about 4 years ago and the boiler has now gone wrong i have been told by customer that is due to no inhibitor added to system a valve has burnt out
but i never completed the job it was done just before xmas and i was asked to get it running for xmas which i did and to come back when they were ready for more of the work to be done
it was several week before i was called back at which time i was unable to complete the job so i sent other plumbers to finish system and other work.
when they where there the customer was moaning about my work that she was not happy about and didnt want me to go and complete so they finished off and left she never paid me up for materials that they used form my suppliers account
now she has phoned me up and demarding i pay for the work on her heating system to fix due to no inhibator in system after 4 years
i never fullycomished the system due to i only got it running for xmas and i knew it would have to be drained down to have extra rads fitted so i saw no point to put inhiabator into sysem only to be drained out a few weeks later
i never finshed job so i see it as the last person to fill it up after fitting the rads should have done this
it should have been checked on serving checks over the last 4 years
this is one of those job that the customer thinks i will gauntee for ever even though she was a cheep skate and the only reason i wasnt allound back was she found some one cheeper to finish the job
any advice would be welcome
many thanks
ps great fourm guys i will be reading much more of it
i have got one of those customers that are being a pain as some are
i done a job about 4 years ago and the boiler has now gone wrong i have been told by customer that is due to no inhibitor added to system a valve has burnt out
but i never completed the job it was done just before xmas and i was asked to get it running for xmas which i did and to come back when they were ready for more of the work to be done
it was several week before i was called back at which time i was unable to complete the job so i sent other plumbers to finish system and other work.
when they where there the customer was moaning about my work that she was not happy about and didnt want me to go and complete so they finished off and left she never paid me up for materials that they used form my suppliers account
now she has phoned me up and demarding i pay for the work on her heating system to fix due to no inhibator in system after 4 years
i never fullycomished the system due to i only got it running for xmas and i knew it would have to be drained down to have extra rads fitted so i saw no point to put inhiabator into sysem only to be drained out a few weeks later
i never finshed job so i see it as the last person to fill it up after fitting the rads should have done this
it should have been checked on serving checks over the last 4 years
this is one of those job that the customer thinks i will gauntee for ever even though she was a cheep skate and the only reason i wasnt allound back was she found some one cheeper to finish the job
any advice would be welcome
many thanks
ps great fourm guys i will be reading much more of it