'been drafted in on day rate to sort out where previous plumber/builder/engineer left off- he took the money and run- apparently?!
Anyway, boiler has been moved from loft to kitchen- well, place is a build site- walls are being plastered, floorboards are up all over the show, etc.
Green star is hanging on the kitchen wall, pipes connected- no flue, cond, pr, one rad and one hot tap.
Can i sort it out she says- ok but i can't guarantee anything, oh yes and the pressure gauge tube is severed.- new gauge-
long story short- boiler was too high for flue, on the inside- dropped it a foot or so, drilled flue hole- bloody hard brick! Changed PG and put a fly lead on boiler to see. Well a big fat nothing happened- no blue light- definitely power to pcb but nothing else. That took best part of a day....
So, she says- she'll just have a new boiler- not wanting to spend ££ trying to fix this one. Hoodwink feeling creeping in, when i said day rate...that didn't include new boiler did it?- ok it should be fairly easy provided the biasi flue lines up with the green star?
mmmm!! any pointers? How to negotiate more money/do the job properly of course, and be fair. 🙁😕
i need the work at the mo' been a bit quiet
Anyway, boiler has been moved from loft to kitchen- well, place is a build site- walls are being plastered, floorboards are up all over the show, etc.
Green star is hanging on the kitchen wall, pipes connected- no flue, cond, pr, one rad and one hot tap.
Can i sort it out she says- ok but i can't guarantee anything, oh yes and the pressure gauge tube is severed.- new gauge-
long story short- boiler was too high for flue, on the inside- dropped it a foot or so, drilled flue hole- bloody hard brick! Changed PG and put a fly lead on boiler to see. Well a big fat nothing happened- no blue light- definitely power to pcb but nothing else. That took best part of a day....
So, she says- she'll just have a new boiler- not wanting to spend ££ trying to fix this one. Hoodwink feeling creeping in, when i said day rate...that didn't include new boiler did it?- ok it should be fairly easy provided the biasi flue lines up with the green star?
mmmm!! any pointers? How to negotiate more money/do the job properly of course, and be fair. 🙁😕
i need the work at the mo' been a bit quiet