Hi,
I live in a block of 5 flats. The 5 meters are mounted outside in a row, according to the flat numbers, 1-2-3-4-5. Flat 4 is a rental and had the gas meter removed many years ago, although the meter box (minus the door) pipework and back plate remain, there is a padlock type device where the lever valve is on the other meters.
We are flat 1 and would like to move our meter from position '1' to the vacant position '4'. This is to allow our outward opening entrance gate to open inwards, currently it would hit our meter. To the untrained eye it looks straightforward... (lol).
My question is whether a gas safe engineer can do this or do we need to approach the supplier/national grid. any idea of the cost would be appreciated. We are in London.
I live in a block of 5 flats. The 5 meters are mounted outside in a row, according to the flat numbers, 1-2-3-4-5. Flat 4 is a rental and had the gas meter removed many years ago, although the meter box (minus the door) pipework and back plate remain, there is a padlock type device where the lever valve is on the other meters.
We are flat 1 and would like to move our meter from position '1' to the vacant position '4'. This is to allow our outward opening entrance gate to open inwards, currently it would hit our meter. To the untrained eye it looks straightforward... (lol).
My question is whether a gas safe engineer can do this or do we need to approach the supplier/national grid. any idea of the cost would be appreciated. We are in London.