T
theskiingbear
I need some help please. We are having a bathroom and a wc fitted out. The plumbers are on a day rate plus reimbursement for plumbing sundries. The bill for sundries comes to £1200. We have had 2 toilets fitted (one toilet had a new soil vent, the other didnt), a free standing bath and free standing taps, a shower tray and associated plumbing, a wall mounted towel rail and a bathroom subfloor fitted (12mm ply and tongue and groove floorboards), 3 sinks. I have all the receipts but they mean absolutely nothing to me, bar the copper piping (6m) and chrome piping (3m). The bathroom is 3 x 4m and the WC is literally a cloak room, small. How does this sound?