Hi guys,
Im after some advice, im based in the north east of england and just gone self employed
Had a look around a big job today;
- Full strip out of all services
- full central heating
- brand new gas line
- moving the bathroom to upstairs and relocating main SVP
- brand new bathroom
- range cooker install
- new fire install
- new kitchen
Thats all for the plumbing side, its getting a extension, new roofs, new guttering
The custard doesnt know where they want the boiler nor what sanitry ware or chose the kitchen yet.
Ive gave them 2 options of where the boiler can go so wrote out 2 estimates (one for the boiler in kitchen, one for upstairs bedroom cupboard)
Since ive just wrote them out i need to give them to the merchants to come back to me with a price for all the materials inc boiler, flue etc
Im not too sure what to charge labour though?!
I was on £11 per hour on my last job. However self employed i should be earning at least £150 a day for this type of job?
Just need some ideas of what i should put onto of my materials for my labour costs.
Thanks
Im after some advice, im based in the north east of england and just gone self employed
Had a look around a big job today;
- Full strip out of all services
- full central heating
- brand new gas line
- moving the bathroom to upstairs and relocating main SVP
- brand new bathroom
- range cooker install
- new fire install
- new kitchen
Thats all for the plumbing side, its getting a extension, new roofs, new guttering
The custard doesnt know where they want the boiler nor what sanitry ware or chose the kitchen yet.
Ive gave them 2 options of where the boiler can go so wrote out 2 estimates (one for the boiler in kitchen, one for upstairs bedroom cupboard)
Since ive just wrote them out i need to give them to the merchants to come back to me with a price for all the materials inc boiler, flue etc
Im not too sure what to charge labour though?!
I was on £11 per hour on my last job. However self employed i should be earning at least £150 a day for this type of job?
Just need some ideas of what i should put onto of my materials for my labour costs.