I've positioned an offset quad shower tray and find that the waste is exiting directly onto one of the joists in the floor (first floor). Moving the tray (low profile) is not an option, what does one do? Is it safe to cut a chunk out of the joist?

Many thanks.

PS I'm a seasoned DIY'er, not a plumber!
 
I'll probably be shot down in flames for saying this but if it's a resin tray as opposed to a cheap plastic material you're probably fine.

BUT - you have to use common sense. There are rules and regulations about how much you can cut out of joists (and I'm sure you're aware of them judging by your question) but I bet all of us here have either seen a rather iffy situation or possibly even "bent" a rule ourselves on occasion when doing things under the floor.

If you think the joist might need supporting then it probably does and you can purchase metal plates and bolts to strengthen it. If the whole floor looks a little precarious I'd suggest changing it for a version that sits up off the floor on legs. Much better to have a less luxurious looking shower than half a house falling down through lack of support for a shower.

One little tip if you need it - shower wastes are notoriously poorly designed and it's quite easy to have a leak. Make sure you test it properly (ideally in place) before you proceed to the next stage of completing.
 
I'd suggest changing it for a version that sits up off the floor on legs. Much better to have a less luxurious looking shower than half a house falling down through lack of support for a shower.

One little tip if you need it - shower wastes are notoriously poorly designed and it's quite easy to have a leak. Make sure you test it properly (ideally in place) before you proceed to the next stage of completing.

I agree with this statement
 
I cant see a problem cutting the joist off short of the wall and putting in a trimmer - a joist at 90 degrees to the other joists which will carry the load of the cut joist to the two adjacent ones. Use builders metalwork to secure. Job done - even without damaging ceiling below I have managed it.

Then leave a trap in the floor to get to waste WHEN it blocks up

centralheatking
 
15mm ply 4x2 and make a stand - get some of that white sure form plastic board they use for soffits and trim and bend around screwing with white caps.

i would never ever cut a joist deep enough for a trap. or take the tray back and get another.
 