Ok so it's a complete new fix but using old cyl. Defo set it up as an S plan and run in the d2 while your on.
Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws
i am re piping the heating system and installing new rads anyway and new boiler is going into a different location so all its all new pipework with new controls.
New boiler (whatever it is) with new pipework & rads = new system & cylinder has to be up-graded to a compliant Part L cylinder.so even if i install a conventional boiler the cylinder has to be replaced because i am upgrading everything else?
Run in the d2? the boiler has blow off and hot water cylinder will have water expantion into cold tank.Ok so it's a complete new fix but using old cyl. Defo set it up as an S plan and run in the d2 while your on.
ahh i seee! will do.If at a later date they do go unvented then whilst everythings a mess run a couple of lengths of pipe under the floor for the future discharge.
http://www.planningportal.gov.uk/uploads/br/domestic_building_services_compliance_guide.pdf
Table 4 Page 19, Yes if Gravity Primary's but its worth a read through the rest of it.
Its the controls that have to be ungraded, not the cylinder itself i.e. fully pumped, separate control, cylinder stat, etc.