The pump wouldn't run all night, it would shut off when the store is up to temperature via the control stat. I'd wire it through a twin channel, but tell the customer to leave it on constant.
That was my first thermal store install, the only pipework I didn't do was the flow and return for the plate heat exchanger. Was a pig to install, had to do it kneeling next to it and standing over an open loft hatch!! Not overly happy with it, the pre-installed pipe work isn't straight and the lack of working space means I couldn't do a neat a job as I'd hoped, never mind, its all getting lagged anyway!
That was my first thermal store install, the only pipework I didn't do was the flow and return for the plate heat exchanger. Was a pig to install, had to do it kneeling next to it and standing over an open loft hatch!! Not overly happy with it, the pre-installed pipe work isn't straight and the lack of working space means I couldn't do a neat a job as I'd hoped, never mind, its all getting lagged anyway!