Hi, as part of an extension/refurb project I will be fitting UFH over a new concrete floor as well as existing joisted timber floor. Both floors being within the same room.
My question is whether anyone has done this mix of subfloors before and noticed a performance/temperature difference between the two areas.
I would imagine that as the UFH on the joisted area sits underneath 22mm of chipboard this would have more heat resistance than the screed equivalent used on the concrete floor area but am interest to know if this is actually the case.
Thanks in advance.
Mark