T
tackleburger
Had the lot this week. 3 hour syphon swap, tiler that can't cut a hole round a pipe left me nothing to work with, tank swap in an attic 3 floors up parking miles away. Then to top all that did a back boiler to combi swap which took three days, just as I was giving the guy the bill the door goes, four coppers rush in and lift him for fraud or something so I never got paid so christ know what I'm going to do.