Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

View the thread, titled "What we all working on this week ?" which is posted in UK Plumbers Forums on UK Plumbers Forums.

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
  • Screenshot_20191031-033046.png
What made you buy shares in Stanley? 😂
The big ones I got about 15 years ago from a well known diy store with only 2 letters from the alphabet in its name. They were on offer. I think they were £12.00 for 3, so got 3 sets. The smaller ones I have I got for an absolute Steal. Got about 32 of them for £10.00 (and they are brilliant. They interlock with each other with side clips)
 
Well it's another rough as bulls lugs jobs that's coming out. Didnt look too bad until started pulling it apart. Cladding in shower on top of tiles, floor tiles under lino. Floor falls away in two directions. Bath and shower wastes running up hill. Ah well. Sandwich time.
 
No more bathrooms for me this side of chrimbo😆 I'm concentrating on smaller projects involved in two new kitchen refit jobs and doing my own one as well, a cloakroom remodel which has been a pita floor had to come up to gain access to the services heating pipe needed tidying up and first fixing ready for new designer style rad and towel rail , stopcock needed moving from the corner all services needed altering and first fixing, then studding out the wall to hide everything plasterer coming Monday so a late one for me tonight as working at home tomorrow, had to dig out the external stopcock chamber got it shut off did the alterations then couldn't get it back on ☹️Essex and Suffolk water had to come out they were first class the inspector snapped the Handle off the stopcock trying to get it turned on but had a tool to get over it replacement can now be booked for a later date. Kop
 

Attachments

Been on this the last 9 days, unfortunately basin was damaged so awaiting customer on getting a replacement. Been a stressful job, glad it’s done and over before Christmas.
Nice Mr Evil I'd be consered about the towel rad being there can see it rusting ? but the customer gets what they want ,9 days is a quick turn around mate well done regards kop
 
Nice Mr Evil I'd be consered about the towel rad being there can see it rusting ? but the customer gets what they want ,9 days is a quick turn around mate well done regards kop
Yes you're probably right. A stainless one was considered, but at over double the price it seemed a lot extra. Considering that if there was excessive water down that end it'd be coming out the tray and into the room I was hoping it'd be OK, thrown in the fact good extraction, and it's a Zehnder not some cheap s***, fingers crossed

My personal preference would be next to basin, but as you say. What customer wants, customer gets. Especially with this customer too.
 

Official Sponsors of Plumbers Talk

Reply to the thread, titled "What we all working on this week ?" which is posted in UK Plumbers Forums on Plumbers Forums.

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Weekly or Monthly Email Digest

Back
Top