I'm sat here bored staring at my flush machine doing its business and got wondering. My old company used to install a new boiler then flush. My current one flushes then installs the boiler. I understand the logic of my new one but what about all the flux from installing new pipework? Surely x400 in a week before install then a flush after install is better or am I missing something? What order do you guys do?