Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

SimonG

Esteemed
Plumber
Subscribed
Up at a big country hall. 4 floors currently run off a big Worcester combi and big Warmflow combi. They run three bathrooms each.
Yes they shouldn't be there but previously occupied by a couple who apparently got what they asked for.
Fast forward to the new occupants who do a lot of entertaining and people staying over.
All 6 bathrooms redone and all radiators on 3 floors changed to cast iron radiators.
Warm flow runs all the ground floor radiators and three bathrooms. It's about 4 years old and current occupants hate it.
Worcester runs floors 1, 2, attic and 3 bathrooms.
Worcester in the kitchen and just can't heat all the radiators.

Now about 10 foot from the boiler in the ceiling void there is space and access to the rising pipework.

So my plan is to cut an access into this void and split the pipework. Allowing the current pump to do the 1st floor and then stick an 8 m pump in to feed 2nd floor and attic, complete with two ports.

Question is, do you think the 8 m pump will rob the first floor when the two zones are on together?

I was thinking of using the combi boiler, re rated to highest output, pump to feed upto the void and then use two pumps in there.
 
Low loss header would be the way but limited for space the risk is there. Kop
 
  • Like
Reactions: SimonG

Official Sponsors of Plumbers Talk

Similar plumbing topics

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.