Search the forum,

ended

Single-ended signaling is the simplest and most commonly used method of transmitting electrical signals over wires. One wire carries a varying voltage that represents the signal, while the other wire is connected to a reference voltage, usually ground. The main alternative to single-ended signaling is called differential signaling where the two conductors carry signals equal in magnitude but of opposite polarity.
Single-ended signaling is less expensive to implement than differential, but it has a distinct disadvantage: a single-ended system requires a power supply voltage equal to the maximum amplitude of the signal to be received whereas a differential system only requires a voltage half of the signal amplitude to be received. For a given power supply voltage then, a differential system produces signals of twice the amplitude and therefore has twice as good noise immunity (6 dB higher signal-to-noise ratio) as a single-ended system.
The main advantage of single-ended over differential signaling is that fewer wires are needed to transmit multiple signals. If there are n signals, then there are n+1 wires, one for each signal and one for ground, while differential signaling uses at least 2n wires. A disadvantage of single-ended systems that utilize a common return is that the return currents for all the signals use the same conductor (even if separate ground wires are used, the grounds are inevitably connected together at each end), and this can sometimes cause interference (crosstalk) between the signals.

View More On Wikipedia.org
  1. N

    1750x750 bath required.

    Can anyone recommend a good quality 1750x750 double ended bath. There is one available made by RAK but I am not sure about the quality of RAK products.
  2. M

    Back to wall double ended baths.

    Anyone fitted many of these? I am just intrested in how the bath panel usually fixes? With it being curved, is it clips on the bottom? And the wall? Thanks
  3. C

    Hi, I was looking into getting a new van and ended up here!

    Hi all, as said I was researching new vans as my old trusty Hi-Ace workhorse that I bought new 13 years ago is being put to pastures new sometime in the next year and somehow or other I stumbled across these forums and decided to sign up. I've been self-employed for the past 14 years and worked...
  4. Dan

    Would you be proud if your child ended up being a plumber?

    Something that might get deep this. And I'd like it if you guys kept it amicable like you usually do. But I wondered, if your boy or girl ended up being a plumber (not always like yourself EXACTLY perhaps they go down a different route but still end up plumbing)..... .... would you be proud of...
  5. M

    single or double ended socket soil pipe

    Is it best to use a single or double ended socket when connecting on to an orange soil pipe to run an internal stack
  6. townfanjon

    Heat loss calcs

    Gents, do any of you use the mr combi heat loss calc apps ? i recently downloaded them to my I-pad, I have just done a calc using the app , and for the room in question I ended up needing 1800 watts, I knows it's a very quick basic one but it sounded a lot so I calculated it long hand like we...
  7. O

    2 jobs - general plumbing & ch / bathroom install - London E1 (outside CCZ)

    Hi, I have a bunch of stuff that needs doing as part of a full renovation. Job 1: Replace leaking joints in copper pipes, bypass shower pump, replace radiator valves. No boiler / gas work. Ideal timeframe: this week or next Job 2: Bathroom install - replacement of bath, basin and...
  8. P

    Ended up in a woman's toilet!

    I was at a social club earlier today and hadn't been there before. I found a toilet went in, no one was in there and done my business while inspecting the plumbing. Continued to wash my hands, next thing my Mrs's walks in, we both do a double take and she says what F are you doing in the...
  9. J

    Good day that ended proper sh@t

    First job, fit a rad in a conservatory. Got there later than expected thanks for ****ing plumb centre taking over half an hour to give me a length of capping !!! Made it up though by pulling me finger out an finished it an alright time. had to drive a bit then to do a breakdown, in an out job...
  10. hammers4spanner

    pipe preference

    One for the fitters amongst us commercial job on and you have a choice between putting in medium iron or mapress, barrel being tried and tested material however time consuming and dirty. Mapress being relative new material simplistic install and clean quick install however alot more expensive...
  11. H

    you Find open ended gas valve in landlords check

    what would you do if you Find open ended gas valve (Waterheater removed) in landlords check Just put a cap on it. problem solved or something else?
  12. P

    No open ended svp's, in high rise buildings

    Just wondering what other posters think about the idea of non vented soil stacks, the tallest building in Dubai is supposed to be like this, I believe that its an Australian "idea", stub stacks off the main stack with an AAV stuck on top of it and inside an enlarged section of pipe, a "bladder"...
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock