no nothing I just spied it. That being said, how come you didn't just weld a gas line seeing as though the LTHW is?
 
Ran out of redlead too ! External plant room, small hospital?
 
Last edited by a moderator:
It's a nicer job than I could do myself but the wiring to burner control and gas valve looks a bit sloppy?
 
To be honest Erm' its a complete pain in the arse wiring them up. You can use Kopex to make it look neater but ultimately it will never look brilliant. You don't get right angles in cable very often.
 
I could do wiring 100% better but would struggle to improve on pipework. Not many clips insight between the boilers?
 
To be honest Erm' its a complete pain in the arse wiring them up. You can use Kopex to make it look neater but ultimately it will never look brilliant. You don't get right angles in cable very often.

Steel conduit to within 150mm and gland on end of it then a steel flex to burner to allow maintenance .
 
no, it's a ceiling brace. it takes 1" tube and you stick it on top of the shouder so its touching ceiling then tighten it up to make it ridgid, good for big tube
 
DSCF6096.jpgDSCF6106.jpgDSCF6112.jpgDSCF6754.jpgDSCF6750.jpgDSCF6757.jpga couple of pics from a recent job we have just finished. 90kw Froling boiler out and a 200kw ETA in. Previous system was totally undersized, if all the properties on the district heating system called at the same time, then only half of them got heat, The boiler was constantly running just to try and keep up, even in the summer when there was no demand for heating, and 4000litres of buffer stood cold!!!.
We replaced the boiler, rejigged the fuel store to allow us to move the buffers (new ones fitted) and then upgraded the pump set.

DSCF6096.jpg


DSCF6106.jpg


DSCF6112.jpg


DSCF6754.jpg


DSCF6750.jpg


DSCF6757.jpg
 
View attachment 19999View attachment 20001View attachment 20002View attachment 20003View attachment 20004View attachment 20005a couple of pics from a recent job we have just finished. 90kw Froling boiler out and a 200kw ETA in. Previous system was totally undersized, if all the properties on the district heating system called at the same time, then only half of them got heat, The boiler was constantly running just to try and keep up, even in the summer when there was no demand for heating, and 4000litres of buffer stood cold!!!.
We replaced the boiler, rejigged the fuel store to allow us to move the buffers (new ones fitted) and then upgraded the pump set.

How much have you come on in the past while Missplumb.
Good to see you are enjoying yourself. Neat work btw :smile:
 

Official Sponsors of Plumbers Talk

Reply to the thread, titled "commercial pictures ?" which is posted in Industrial Plumbing Advice Forum on Plumbers Forums.

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Thread Information

Title
commercial pictures ?
Prefix
N/A
Forum
Industrial Plumbing Advice Forum
Start date
Last reply date
Replies
335

Thread statistics

Created
on31ll,
Last reply from
Sparkgap,
Replies
335
Views
41,437

Weekly or Monthly Email Digest

Back
Top