So typical working conditions for a boiler engineer then !!Hot as ...:devil:There is an unvented cylinder in there as well.... the place is at least 25°C... maybe more :lol:
So typical working conditions for a boiler engineer then !!Hot as ...:devil:There is an unvented cylinder in there as well.... the place is at least 25°C... maybe more :lol:
Yeah they always send someone to commission them.Not a huge Fan of Strebels TBH, can't be commissioned by just turning them on :lol:.
Needed on of their service team with a laptop to set up the 2 we fitted into master and slave.
Yeah they always send someone to commission them.
View attachment 18795View attachment 18796
A bit more welding to finish these two Strebel SCB 150's off
Its 3" to 2" (2" connection on the gas meter)Bit of a throttle down there. 6" to 2" in 9"? Nice weld tho, no slag and no splatter? You dad do it? Wish mine were always that tidy. Jesus some look line the lid of bait cabin microwave !
Reply to the thread, titled "commercial pictures ?" which is posted in Industrial Plumbing Advice Forum on Electricians Forums.