I am looking at instructing a commercial gas safe registered and plumber to start works in moving an existing plant room and also expand it.
Requirements:
Moving two ACV direct hot water tanks , adding one more
Installing 6 accumulators - piping a header
Tank
Preparing and install riser for
Clod water, hot water, flow and return
Main pipe work to be in copper or mlcp to be considered
Pipe work to be 54mm
If possible also prep for UFH Manifolds or can be done by others
I am looking to start the works as soon as possible.
Please let me know if you are interested in the works.
Darren
Requirements:
Moving two ACV direct hot water tanks , adding one more
Installing 6 accumulators - piping a header
Tank
Preparing and install riser for
Clod water, hot water, flow and return
Main pipe work to be in copper or mlcp to be considered
Pipe work to be 54mm
If possible also prep for UFH Manifolds or can be done by others
I am looking to start the works as soon as possible.
Please let me know if you are interested in the works.
Darren