Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

R

Richard at Home

Good evening and a happy new year to you all

I welcome any comments and feedback to my project I am looking at starting in 2013

now I know all this sort of thing can be done with many of the costly out of the box solutions that probably cost more than the boiler itself

What I am looking at doing is to create a heating system that has at least 3 Zones

I believe I could do this with some changes to the main Pipe work and 3 motorised zone valves and an additional time clock


Reason for project

During the day one member of my family is at home and requires heating to be on for 4 rads in part of the house.

Currently I am heating all the house all day when only part of the house needs to be heated

My daughter-in-law is also at home some times when not at Uni and may need her front room heating.

Now my logic is to have the secondary time clock switching the water flow between parts of the house during the day and in the evenings opening all valves to heat the complete house

Now I know this could also be done with the new wireless digital TVRs but this expense would be significant


I will add to this post as the project develops

If you have any questions or would like to bounce ideas or comments please reply and this may become an interesting post.


Thank you for your time

Best regards

Richard
 
Why not design your system on paper and get it ratified/validated by a pro. Best of both worlds then.

If you're good on the tools then at least you'll know what your doing will work.
 
  • Like
Reactions: 5 people
I have drawn up the current layout of the Heating and Hot water system and i am going to use this as my basis for my modification for the project
I have not drawn up the proposed layout yet

But my idea is to take the 2 main 22mm flow and return pipes and add 2 more runs making a total of 3 Main Zones
Connect the desired Radiators to them and join them all up with the Zone valves to create one system full system.
Hope that makes sense
 

Attachments

  • Heating System.jpg
    Heating System.jpg
    98.3 KB · Views: 204
Sorry for the delay i was trying to upload the layout pictures

I do not expecting anyone to do this for me in any way it is my project and i want to do it.

Would i give free advise 100% i always do i love sharing my experiences and hopefully it helps others i have a webpage dedicated to sharing information

I have set this post up for everyone to look at like all internet information take it at face value and do your research.

Thanks everyone for your comments its all good.

Regards

Richard
 
  • Like
Reactions: 1 person
I would never ask someone to take on this sort of project on Professional or otherwise for me.

It is something i want to do as a project.

I moved in the house 3 years ago and the old plumbing is a mess and i want to remove it all and reinstall a new clean layout.

I will 100% guarantee that I will do this. it will work how i intend it to, and i will share all my experiences with you all good and bad and hopefully some may enjoy the read.


Thanks

Richard
 
I would never ask someone to take on this sort of project on Professional or otherwise for me.

It is something i want to do as a project.

I moved in the house 3 years ago and the old plumbing is a mess and i want to remove it all and reinstall a new clean layout.

I will 100% guarantee that I will do this. it will work how i intend it to, and i will share all my experiences with you all good and bad and hopefully some may enjoy the read.


Thanks

Richard

In that case, starting from fresh, don't make the same mistakes again. Use the right tools and materials for the job. And while you're at it, take out the y plan valve on your cylinder and fit 4 2 port valves.
 
  • Like
Reactions: 1 person
I have drawn up the current layout of the Heating and Hot water system and i am going to use this as my basis for my modification for the project
I have not drawn up the proposed layout yet

But my idea is to take the 2 main 22mm flow and return pipes and add 2 more runs making a total of 3 Main Zones
Connect the desired Radiators to them and join them all up with the Zone valves to create one system full system.
Hope that makes sense

Can't really read the detail on my phone. Why not junk the pumps and the CWST and install an unvented tank?
 
if you are talking about a Combi system the mains water pressure on my property is very poor and insufficient for the size

I am running a valiant 438 eco tec System boiler
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.