N
NJD1977
Looks to me like there is just enough copper to freeze straight after lead. But it's close to call so could be wrong.
I would never take that job in unless it was in my own house.
There is 50mm of copper between the lead pipe and the lip of the elbow fitting. If you include the elbow more like 60mm. I think this would accept an electric freeze clamp but with it being so close to both the elbow and the lead to copper wipe it puts doubt in my mind.