Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Sep 15, 2019
65
15
8
Member Type
General Plumber
Recently they flushed the system and installed the valve and filters. It is open vented cold feed and vent are in airing cupboard. No sign of safety valve on boiler, I was taught 40 years you never fitted

valves on the primary circuit for obvious reasons, do i tell homeowner?
b Cott.jpg
 
And if sealed system and prv after pump like it normally is
Is that correct, or just the rubbish you end up coming across? I'd be more inclined to want the PRV to be upstream of the EV and thus between the pump and the boiler, though I'm ready to be told I'm wrong.

Don't think It was a legal requirement back then either as it would have stated "must be fitted"
I think 'should be fitted' means 'and jolly well shall be fitted', though, being course material, it isn't 100% clear what was a legal requirement and what was just the author trying to influence his students. I note the only 'must's in that entire extract refer to the same thing: not blocking the path between the boiler and the open vent i.e. ON THE FLOW (even though the wording is clumsy and you need to take the two 'musts' together for it to be clear that this is what it means), so I think your interpretation that 'must' refers to a legal requirement is probably correct.
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.