Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Inverness

Plumbers Arms member
Plumber
Gas Engineer
Jul 28, 2013
724
66
28
Member Type
General Plumber
hi everyone, back to a finish a job tomorrow with my boss who is gas safe registered.
we have installed a new glow worm c30 combi boiler in a new build garage which has a slight pitched roof.

we have the flue from boiler going straight up in two sections. the first section is 1meter long and between the roof trusts we've have supported flue clip. then the other section of flue is the the terminal which has came provide by glow worm that the roofers who are dealing with that part.

I'm still training for my gas safe and i was trying to find out from the manufactures if there has to be a inspection hatch fitted in the garage ceiling with a co2 alarm fitted. the void space will be less than a 1 meter. can some one shine some light on this issue.

cheers
 
well the first joint of the flue will be below the garage ceiling.
 
only if there is a hidden joint there should be an inspection hatch. thanks very much guys.
 

Official Sponsors of Plumbers Talk

Similar plumbing topics

E
Replies
2
Views
1K
E
L
Replies
24
Views
770
T

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.