Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

Spreck

Gas Engineer
Sep 7, 2013
28
4
3
South Birmingham
Member Type
Heating Engineer (Has GSR)
Hi Guys,

has as anyone had to do a conversion from the old gas valve on a Worcester Greenstar 30Si to the new one they are supplying now?

it looks like it might be an a*se? Seems it comes ready for 28kw and you need to faff to settle the Co/Co2 ratio change over some lovely plastic connections to enable changeover ((I'm not a lover of plastic parts in boilers although the norm now damn cost reductions! (Not passed on to us!!!))

Ratio I can sort but looking for any tips tricks angles of insertion? Only clean posts I know it's tempting!

Ta
 
Ok update...
if you have access to the left hand side of the boiler it would be a lot easier to get the valve fixing screws in and out. If not out with the old style condense trap ,short PZ1 required as condense mounting riveted! Bit tight on space to get the new valve connection onto the pushfit so I'd do it first in hindsight easier to make the rubber hose connection and grab clip in after.

if no access on left allow yourself another half hour of swearing at grazed knuckles when pricing!

hope this helps in the future.

spreck
 
  • Like
Reactions: 1 person

Official Sponsors of Plumbers Talk

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.