Discuss Chlorination of 63mm mdpe incoming cold mains in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
S

Sharp Point

Evening folks, I'm about to commence work on a 8 bed new build dwelling, the custard has just emailed me, asking if i know anything about how the incoming mains from road( about 130 metre run). Is it a requirement before or after Anglian water connect it in the road? I've carried out chlorination of schools in the past ( very boring job) but how is it carried out pre or post connection? Do you need a special qualification to sign off a clean out?

Thanks
 
Evening folks, I'm about to commence work on a 8 bed new build dwelling, the custard has just emailed me, asking if i know anything about how the incoming mains from road( about 130 metre run). Is it a requirement before or after Anglian water connect it in the road? I've carried out chlorination of schools in the past ( very boring job) but how is it carried out pre or post connection? Do you need a special qualification to sign off a clean out?

Thanks

dont the water board do it after they tap in?
 
flush n go, its domestic isnt it? dont suppose your storing cold water in a new build
 
i would just get a firm in once the main is in and ready to flush, they will supply the test certificate needed for the water board.
 
I think you & your customer are in for a bit of a shock unless things have changed in the last few years. Once you go over 50mm on mains the pipes need to be swobbed out by pulling a chlorine soaked rag through the whole length of it. The trench will need to remain open until they come & inspect it, thats all before they make the connection.
 
Just had a look at snowheads link, oh yes forgot about the samples as well, as others have said get a firm in but be prepared for a hefty bill.

Can you self-cert the internal stuff ? otherwise you may want to check out the water supplies T&Cs, Thames wanted min 10 working days to come & inspect the completed install, then up to 21 days before they would do the connection bit of a long time to have a completed house without a water supply (hope they have a temporary supply?
 
the best thing to do is get friendly with the local inspector and follow whatever advise/ orders he/she gives you.
 
live n learn, seems a bit ott but rules is rules

Our guys who install the main network on sites have to chlorinate their tools as they work & are not allowed to work if they have some every day infections.
I was not aware of any of this until I started this new job. Every days a school day.
 
Status
Not open for further replies.

Reply to Chlorination of 63mm mdpe incoming cold mains in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

  • Question
Ideal Logic 24, Previous problem was that the hot water was only cold or barely warm if the heating was in use. If heating was off and boiler cold...
Replies
2
Views
223
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
463
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16...
Replies
0
Views
240
S
Hi, I seemed to have a blockage in kitchen sink. A plumber came and cleared all the pipework that is visible inside my home (there was debris and...
Replies
2
Views
162
Sonya K
S
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
560